Gansu Zhouqu Shimenping 15 MW Hydropower Station Project

CDM-1136 ↗

#1242of 1935 in Renewable energy#727of 1084 in China#969of 1459 in CDM (UNFCCC)#404of 806 in AMS-I.D

4.8/ 10
Integrity
4.5
Transparency
4.5
Claim Safety
5.5
Documentation
4.5

Audit Analysis

A 15 MW small-scale hydropower project under CDM with a jurisdictional baseline and a reasonable 0% leakage deduction, but the extracted record lacks critical details on additionality testing, permanence safeguards, and monitoring methodology. The ERR discrepancy between the PDD and validation report is almost certainly an annual-versus-lifetime reporting difference (39,649 × 7 ≈ 277,545), but the absence of monitoring reports and several key MRV parameters limits confidence in the project's ongoing performance.

Red Flags

  • Additionality test type and VVB confirmation are not stated in the extracted record, leaving the core additionality claim unverified in available documents
  • No buffer pool, permanence mechanism, or reversal-risk assessment is documented for the 7-year crediting period
  • No monitoring reports were found in the extracted record; the only verified ERR figure (39,649) comes from the validation report, not from an independent monitoring period
  • FPIC and grievance mechanism are not documented despite safeguards being mentioned in the validation report

Credit Vintages

IssuedRetiredAvailable
2009
66,542066,542
2010
43,620043,620
2011
48,083048,083
2012
44,699044,699
2016
110,2300110,230
2017
61,231061,231
2022
172,4890172,489
Total546,8940546,894

Risk Indicators

Additionality

Test type and VVB confirmation not stated in extracted recor

Permanence

low inher

Leakage

0% deduction, deemed negligible — appropriate for hydro disp

Baseline

Jurisdictional baseline, grid EF 0.6066 (2019), reassessed 2

Safeguards

Safeguards and benefit sharing mentioned; FPIC and grievance

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-29AMS-I.D

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents