Grid Connected Wind Power Project by M/s. D. J. Malpani at Ratan Ka Bas (RKB), Rajasthan
#1545of 1935 in Renewable energy#863of 975 in India#1335of 1459 in CDM (UNFCCC)#524of 806 in AMS-I.D
Audit Analysis
A CDM wind power project in Rajasthan with a confirmed additionality assessment and jurisdictional baseline, but severely undermined by a seven-fold discrepancy in claimed emissions reductions between the PDD and the validation report, six material findings requiring correction, and a near-total absence of monitoring or verification data. The project's fundamental design (grid-connected wind displacing fossil-fuel generation) is sound, but the documentation and data reliability issues raise significant concerns about the accuracy of the credit quantity.
Red Flags
- Seven-fold discrepancy in total ERR: the PDD (Sep 2019) claims 52,598 tCO2e while the validation report (Oct 2019) records only 7,514 tCO2e — a difference of roughly 45,000 tCO2e that is unexplained in the available documents
- Six material findings in the validation report, including an incorrect installed capacity figure, inconsistent build-margin values, and a mismatched annual GHG reduction figure between the PDD and the ER sheet
- No monitoring report or verified ERR figure is available in the extracted record, making it impossible to confirm actual performance against the (already disputed) ex-ante estimate
- Minimum extraction confidence is rated low, indicating at least one key document was poorly readable, which compounds the data-reliability concern
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2015 | 11,122 | 0 | 11,122 | |
| 2018 | 18,953 | 0 | 18,953 | |
| Total | 30,075 | 0 | 30,075 |
Risk Indicators
VVB-confirmed combined test
Avoidance project, no reversal risk
Deemed negligible, reasonable for grid wind
Jurisdictional, reassessed 2019
Mentioned but FPIC and grievance mechanism not documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →