GS10789 GS10790 RVPA-10: Efficient and Clean Cooking for households in Mozambique
GS-3653 ↗ · current registry ID: GS11606
#49of 202 in Industrial#2of 9 in Mozambique#144of 426 in Gold Standard (GS)
Audit Analysis
This Gold Standard improved-cookstove project in Mozambique has a VVB-confirmed combined additionality test, a quantified 5% leakage deduction, and conservative verified usage rates below assumptions. However, the project is burdened by an unusually large number of material findings and corrective actions (over 30 items), a significant fNRB discrepancy between the validation and verification reports (0.64 vs 0.88), and a project-specific baseline, which collectively undermine confidence in the robustness of the carbon accounting.
Red Flags
- fNRB value discrepancy of 37% between the validation report (0.64, Aug 2025) and the verification report (0.88, Dec 2025) — a material difference that directly affects the carbon accounting
- Over 30 material findings and corrective actions across multiple verification cycles, including inconsistencies in baseline fuel consumption, SDG impact values, thermal efficiency parameters, and ER calculation sheets
- No buffer pool percentage stated in any available document, leaving permanence risk for stove replacement unaddressed
- CORSIA eligibility and CCP status are not stated in any available document, leaving dual-channel risk unassessed
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2021 | 5,024 | 0 | 5,024 | |
| 2022 | 21,423 | 0 | 21,423 | |
| 2023 | 43,069 | 0 | 43,069 | |
| 2024 | 35,694 | 0 | 35,694 | |
| 2025 | 5,461 | 0 | 5,461 | |
| Total | 110,671 | 0 | 110,671 |
Risk Indicators
VVB-confirmed combined test
No buffer pool stated; no reversals
5% quantified deduction
Project-specific, reassessed 2025
FPIC and grievance present; doc contradictions
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →