Hebei Shangyi Manjing West Wind Farm Project
#962of 1935 in Renewable energy#516of 1084 in China#705of 1459 in CDM (UNFCCC)#756of 1287 in ACM0002
Audit Analysis
A CDM wind energy project in China validated by CEC under the well-established ACM0002 methodology, with a jurisdictional grid-based baseline and a 7-year crediting period (2015–2022). The project is fundamentally sound for its sector, but the extracted record lacks explicit additionality documentation and several transparency fields, and two apparent contradictions in the source documents (ERR scope and leakage characterization) require careful interpretation. Overall a moderate-quality credit with no major red flags but notable evidence gaps.
Red Flags
- Additionality test type and VVB confirmation are not stated in the extracted record, leaving the core CDM additionality requirement unverified in available data
- The PDD (2017-02-09) reports a total of 669,627 tCO2 while the validation report (2017-02-10) reports 95,661 tCO2; although the ratio (7×) matches the 7-year crediting period and likely reflects a full-period vs. annual scope difference, the labeling as 'total_err_claimed' in both sources creates ambiguity
- Monitoring period is not stated in any extracted document, making it impossible to independently verify the temporal scope of the reported ERR figures
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2009 | 56,618 | 0 | 56,618 | |
| 2010 | 125,333 | 0 | 125,333 | |
| 2011 | 86,945 | 0 | 86,945 | |
| 2013 | 91,989 | 0 | 91,989 | |
| 2014 | 171,479 | 0 | 171,479 | |
| Total | 532,364 | 0 | 532,364 |
Risk Indicators
Not explicitly stated in extracted record
Avoidance project, no reversal risk
0% deduction, negligible for grid wind
Jurisdictional grid baseline, 2014 EF
Mentioned but FPIC and grievance not detailed
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →