Skip to main content
ICRAvoidance / ReductionUAAMS-I.D

Ignatpil Solar Power Plant

ICR-182 ↗

#418of 770 in Renewable energy#1of 32 in Intl. Carbon Registry (ICR)#143of 417 in AMS-I.D

4.6/ 10
Integrity
5.5
Transparency
3.5
Claim Safety
5.5
Documentation
3.0

Audit Analysis

The Ignatpil Solar Power Plant is a straightforward renewable-energy avoidance project under the ICR registry with a jurisdictional baseline and a combined additionality test, but the available record consists solely of the PDD with no verification or monitoring reports. Permanence risk is unassessed (only a section header exists), the additionality test lacks VVB confirmation, and no verified emission reductions are available to validate the ~150,000 tCO₂ lifetime claim. The project is not inherently high-risk given its solar-avoidance nature, but the documentation gap prevents a confident quality assessment.

Red Flags

  • Permanence risk section in the PDD contains only a header ('Permanence risk (%)') with no actual assessment or value, and no buffer pool percentage is stated
  • No verification report or monitoring report is available; the additionality test (combined) is not confirmed by any named VVB
  • Leakage deduction is 0% with only a 'deemed negligible' justification and no quantitative analysis
  • FPIC is explicitly not conducted and no grievance mechanism is documented

Credit Vintages

IssuedRetiredAvailable
2020
2,49402,494
2021
15,239015,239
2022
14,697014,697
2023
14,968014,968
2024
14,968014,968
2025
14,968014,968
2026
14,968014,968
2027
14,966014,966
2028
14,968014,968
2029
14,968014,968
2030
14,968014,968
Total152,1720152,172

Risk Indicators

Additionality

Combined test in PDD but no VVB confirmation

Permanence

Risk section unassessed; no buffer pool stated

Leakage

0% deduction, 'deemed negligible' only

Baseline

Jurisdictional, 2020 grid EF; reassessment date not stated

Safeguards

Mentioned; FPIC not conducted; no grievance mechanism

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-18AMS-I.D

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents