Skip to main content
ICRSequestration / RemovalISGeneral Methodologyv2.0

Lyngdalur Áfangi II

ICR-403 ↗

#37of 38 in ARR (afforestation)#11of 12 in IS#31of 32 in Intl. Carbon Registry (ICR)

0.5/ 10
Integrity
0.0
Transparency
0.0
Claim Safety
1.5
Documentation
1.0

Audit Analysis

The available record for Lyngdalur Áfangi II contains virtually no extractable project data: a single document of unknown type was used, extraction confidence is low, and no additionality, baseline, permanence, leakage, or MRV information could be confirmed. Without any verifiable evidence of project design, monitoring, or third-party verification, the project cannot be assessed on any meaningful quality dimension.

Red Flags

  • No additionality assessment, baseline method, or VVB verification found in any available document
  • No permanence or buffer pool mechanism identified for a sequestration/removal project
  • No leakage treatment (deduction or justification) documented
  • No ERR figures (claimed or verified) available to assess over- or under-crediting
  • Single document of unknown type with low extraction confidence — the evidentiary base is effectively absent
  • Leakage not addressed in project documentation
  • Buffer pool size not disclosed in available documents

Credit Vintages

IssuedRetiredAvailable
2028
1270127
2029
1300130
2030
1300130
2031
1300130
2032
1240124
2033
4140414
2034
4390439
2035
4680468
2036
4980498
2037
5320532
2038
5710571
2039
6140614
2040
6580658
2041
7090709
2042
7640764
2043
8210821
2044
8840884
2045
9510951
2046
1,01801,018
2047
1,09001,090
2048
1,16201,162
2049
1,23301,233
2050
1,30201,302
2051
1,36901,369
2052
1,43301,433
2053
1,48901,489
2054
1,54001,540
2055
1,58001,580
2056
1,61301,613
2057
1,63401,634
2058
1,64701,647
2059
1,64901,649
2060
1,64101,641
2061
1,62401,624
2062
1,60101,601
2063
1,56901,569
2064
1,53401,534
2065
1,49401,494
2066
1,45201,452
2067
1,40601,406
2068
1,36201,362
2069
1,31601,316
2070
1,27001,270
2071
1,22701,227
2072
1,18201,182
2073
1,13801,138
2074
1,09701,097
2075
1,05801,058
2076
1,02001,020
2077
9830983
Total52,697052,697

Risk Indicators

Additionality

No additionality assessment found

Permanence

No permanence mechanism documented

Leakage

No leakage treatment found

Baseline

No baseline method stated

Safeguards

No safeguards information found

Double-claim

CORSIA/CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-18General Methodology v2.0

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents