VIÑALES BIOMASS POWER PLANT
Score Breakdown
Integrity
verified Additionality was confirmed by the VVB, and the project uses a recognized baseline methodology under ACM0006.
missing The verification report lists multiple findings and corrective actions, and reversal risk is not addressed with any buffer pool information.
Transparency
verified A named VVB is identified, the monitoring period is stated, and the verification report provides a quantified verified emissions reduction figure of 460,837.
missing The extracted record shows inconsistencies between documents, missing monitoring-method detail, and no claimed-versus-verified comparison because the claimed figure is not stated.
Claim Safety
verified Leakage is treated with a quantified deduction of 0%, and the project is marked as CORSIA-eligible in the extracted record.
missing The project is not CCP-approved in the available record, and contradictions around additionality, CORSIA eligibility, and leakage justification reduce confidence in the claim.
Documentation
verified The record draws on many documents, with 31 documents used and a recent verification report dated 2024-12-11.
missing Extraction confidence is only medium, and the verification report itself notes omissions, inconsistent equipment details, and several corrective actions.
Detailed Analysis
Integrity
The verification report confirms additionality through a common-practice test, and the project uses ACM0006 with the baseline last reassessed in 2020. However, the report also lists multiple CARs and CLs, including inconsistencies in monitoring equipment, monitored parameters, and the ERR sheet, which weakens confidence in the robustness of the emissions accounting. Permanence is not well supported because reversal events are not addressed and no buffer pool percentage is stated.
Transparency
The record identifies Verifit Colombia S.A.S as the VVB and gives a clear monitoring period from 2021-01-01 to 2023-12-31, with 460,837 verified emission reductions reported in the verification report. At the same time, the claimed amount is not found in the extracted record, so a direct claimed-versus-verified comparison cannot be made. Monitoring-method detail is also not stated, and the report itself flags omissions and inconsistencies across documents.
Claim Safety
Claim safety is weakened by the combination of a project-specific baseline, unresolved documentation issues, and contradictory statements about leakage justification and additionality testing across documents. The extracted record marks the project as CORSIA-eligible, but CCP status is only not mentioned, so dual-market claim risk is not fully resolved. The 0% leakage deduction is helpful, but the verifier’s findings and the lack of verified usage-rate detail leave residual over-crediting risk.
Documentation
Documentation breadth is reasonably strong, with 31 documents used and a recent verification report dated 2024-12-11. Still, extraction confidence is only medium, and the report notes several omissions, inconsistent equipment identification, and the need to correct versioning and traceability issues. The absence of a stated buffer pool, usage monitoring method, and several other key fields limits completeness.
Overall
Overall, this is a moderately credible but imperfect file: the project has VVB-confirmed additionality and a quantified leakage treatment, yet the verification report contains multiple findings and corrective actions that point to documentation and MRV weaknesses. I privileged the most recent verification report for the final values where contradictions existed, because it is the latest and most specific source, but I discounted confidence because the record also shows earlier conflicting statements on additionality testing, FPIC, CORSIA eligibility, leakage justification, and crediting-period dates. Given those contradictions and the unresolved permanence and safeguards gaps, the project should be treated cautiously rather than as a high-confidence claim.
Audit Analysis
This is a registered VCS biomass removal project with VVB-confirmed additionality and a quantified leakage treatment, but the evidence base is weakened by multiple verification findings and several unresolved documentation inconsistencies. The project appears to have meaningful MRV activity, yet the record shows gaps around permanence, safeguards, and the consistency of reported monitoring information, which raises claim-risk and reliability concerns.
Project Description
The Viñales Biomass Power Plant generates renewable electricity and steam using biomass residues from forestry and sawmill operations. With a 210-ton/hour fluidized bed biomass boiler and a 41 MW turbo generator, it reduces greenhouse gas emissions by avoiding biomass decay and displacing fossil fuels. The project also creates local jobs and strengthens the regional supply chain, setting a benchmark for sustainable industrial practices.
Red Flags
- The verification report records multiple CARs and CLs, including inconsistencies between the verification report, monitoring report, and ERR sheet.
- Permanence is not well supported: reversal events are not addressed and no buffer pool percentage is stated.
- Safeguards are only partially documented: FPIC is not found in the extracted record and the verifier requested evidence on no net harm and local stakeholder process.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2014 | 96,119 | 83,330 | 12,789 | |
| 2015 | 241,788 | 193,540 | 48,248 | |
| 2016 | 266,124 | 252,991 | 13,133 | |
| 2017 | 20,000 | 0 | 20,000 | |
| 2021 | 124,319 | 41,802 | 82,517 | |
| Total | 748,350 | 571,663 | 176,687 |
Cosa migliorerebbe questo punteggio
- Provide a fully reconciled document set that resolves the reported inconsistencies in monitoring equipment, monitored parameters, ERR values, and crediting-period dates.
- Add explicit evidence for permanence and safeguards, including buffer pool treatment or reversal management, FPIC or equivalent stakeholder documentation, and a clear monitoring method for usage and leakage.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed test present
No buffer pool stated
Quantified leakage treatment
Project baseline, reassessment timing limited
Partial safeguards evidence
CORSIA-eligible; CCP not stated
Where to buy
Marketplaces
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →