Skip to main content
ICRSequestration / RemovalISGeneral Methodologyv2.0

Vikrar í landi Skriðufells í Þjórsárdal

ICR-45 ↗

#38of 38 in ARR (afforestation)#12of 12 in IS#32of 32 in Intl. Carbon Registry (ICR)

0.5/ 10
Integrity
0.0
Transparency
0.0
Claim Safety
1.5
Documentation
1.0

Audit Analysis

This Icelandic sequestration/removal project (ICR-45) has only a 2019 Project Design Document and one unidentified document in the available record. No additionality test, baseline methodology, permanence mechanism, leakage treatment, or verification by an independent body is documented, leaving the claimed 17,676 tCO₂e entirely unsubstantiated.

Red Flags

  • Sequestration/removal project with no documented buffer pool or permanence mechanism — carbon stored in biomass or soil is fully exposed to reversal risk with no safety net
  • No additionality assessment of any type found in the available record; the project's causal contribution to emissions reduction is unproven
  • No baseline methodology stated, making the 17,676 tCO₂e claimed reduction impossible to validate against a counterfactual
  • No independent verification body (VVB) identified; no verification or monitoring reports in the record
  • Leakage treatment entirely absent for a land-use/forestry project where displacement of activity is a well-known risk
  • Leakage not addressed in project documentation
  • Buffer pool size not disclosed in available documents

Credit Vintages

IssuedRetiredAvailable
2023
58058
2024
60060
2025
60060
2026
60060
2027
57057
2028
1950195
2029
2060206
2030
2190219
2031
2330233
2032
2490249
2033
2670267
2034
2850285
2035
3060306
2036
3300330
2037
3530353
2038
3790379
2039
4060406
2040
4340434
2041
4610461
2042
4880488
2043
5140514
2044
5380538
2045
5570557
2046
5730573
2047
5840584
2048
5900590
2049
5920592
2050
5880588
2051
5780578
2052
5650565
2053
5470547
2054
5270527
2055
5050505
2056
4800480
2057
4570457
2058
4330433
2059
4090409
2060
3870387
2061
3660366
2062
3460346
2063
3280328
2064
3120312
2065
2970297
2066
2850285
2067
2730273
2068
2630263
2069
2540254
2070
2450245
2071
2390239
2072
2320232
2073
2320232
Total18,202018,202

Risk Indicators

Additionality

No additionality assessment found

Permanence

No buffer pool or permanence mechanism documented

Leakage

No leakage treatment in a land-use project

Baseline

No baseline method stated

Safeguards

No FPIC, grievance, or safeguards documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-18General Methodology v2.0

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents