5.3/ 10
Integrity
6.5
Transparency
4.5
Claim Safety
5.5
Documentation
3.5

Audit Analysis

A 9 MW wind project under CDM AMS-I D with a VVB-verified investment additionality test and a jurisdictional grid-emission-factor baseline. The validation report recorded 37 material findings (mostly financial-analysis and PDD documentation errors) that were subsequently resolved, but no monitoring-period data or verified emission reductions were available in the extracted record. The low extraction confidence and absence of post-validation monitoring data limit the ability to confirm that claimed reductions were actually delivered.

Red Flags

  • 37 material findings in the validation report, including incorrect IRR calculations, missing documentary evidence for CDM consideration, meter-calibration ambiguities, and inconsistent baseline emission-factor values across PDD sections
  • No monitoring-period data or verified emission-reduction figures were found in the extracted record, making it impossible to confirm actual delivery against the 162,670 tCO₂e lifetime claim
  • Low extraction confidence indicates at least one key document was poorly readable, reducing reliability of the extracted facts

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Avoidance project, no reversal risk

Leakage

Negligible, justified for wind

Baseline

Jurisdictional grid EF

Safeguards

Mentioned but FPIC/grievance not confirmed

Double-claim

CDM credits; CORSIA/CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-25AMS-I D

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents