Project Carcará
Audit Analysis
Project Carcará is a small-scale (256 tCO₂e) enhanced weathering carbon removal project with VVB-confirmed additionality and no reported reversals, but it carries a notable number of material findings (13) and corrective actions (10) that raise concerns about MRV robustness. The absence of independently tested carbon content, unverified storage, and two inter-document contradictions (permanence and leakage) temper confidence in the credit's integrity. The project is early in its crediting period with no verified ERR yet available for comparison.
Red Flags
- Thirteen material findings in the verification report, including two nonconformities (rain gauge not used; sampling protocol not followed) and two misstatements (limestone application emissions factor likely underestimates emissions; porewater temperature measurement procedure not as described in the PDD)
- Carbon content was not independently tested and storage was not independently verified, leaving the core carbonation claim reliant on the proponent's own lab data
- Permanence claim differs by a factor of ten between the PDD (1,000 years) and the validation report (10,000 years)
- FPIC was not conducted despite the project operating on agricultural land with local stakeholders
- No verified ERR figure is available in the extracted record, preventing any over- or under-delivery assessment
Credit Vintages
Issuance data not yet available — check back soon.
Risk Indicators
VVB-confirmed combined test
2% buffer; 10× permanence contradiction; storage unverified
0% deemed negligible; PDD suggested quantification
Project-specific; no reassessment date stated
Grievance mechanism and benefit sharing present; FPIC not conducted
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →